Make left and climb 57 steps to S. 10th St. Pedestrian Bridge. At the request of SSSNA & Slopes residents, the City of Pittsburgh and the Norfolk Southern Railroad completed this footbridge in the summer of 2002 to reinstate pedestrian access between the Slopes and Flats. In 2005, lighting was added. Stop mid-span and look left to view the spectacular St. Michael church on the hillside. Continue across the railroad tracks and climb 49 steps to Fritz St.
Donate to the South Side Slopes Association
SSSNA Newsletters
Thanks to our sponsor for their support: